Hydropower plant in Romania

79 ha of agricultural land next to the river Olt. The project includes a dam with 5 sections of 10 m each, also 1500 m2 with 450 m2 of built-up area (for technology) are included in the project. A transformer station for feeding the produced electricity is on ...
Property number: | PRO0166 |
Rooms: | 0 |
Living space: | ,00m² |
Property size: | 79,00ha |
Location - region : | Arad(RO) Romania |
price: | 4.300.000,00 € | ~ 3.686.820,00 £ | ~ 4.756.660,00 $ |
NO ENERGY CERTIFICATE IS CURRENTLY AVAILABLE FOR THIS PROPERTY. IN PREPARATION. |
You can object to the use of your email address at any time
without incurring any costs other than the basic rates.
... site. This dam is not in operation and needs to be renovated and equipped with new turbines. EU subsidies can be applied for. 4 to 6 MW are possible. All registered in the land register. Flow velocity 174 to 195 m/sec. Hydropower plant in Romaniamore... 317153 Gurahont, Romania, Near Fagaras {Brasov}